Parks Revitalisation Grants Program

$300,000 upgrades now available for existing local parks and reserves in Victoria

With public lighting high on the list of considerations for the $10 million Park Revitalisation Grants Program, Leadsun is excited to release our Exclusive SMART public lighting upgrade package in conjunction with this grant so you can get the most value possible when investing in a healthier and more active community.

Exclusive SMART public lighting upgrade package

✅  Extended-life 10-year battery guarantee 

✅  Complimentary EDGE wireless control worth $5000

✅  5 year full system warranty 

✅  Full on-site compliance lighting audit 

✅  Tailored Isolux plot lighting design

    Contact us to find out more

    This package is only available to Victorian councils applying for a lighting upgrade to an existing park or reserve as part of the Parks Revitalisation Grants Program. Offer ends 9 September 2020. 

    Free-Edge2

    Free EDGE upgrade – Valued at $5000

    Remotely monitor and configure your lighting control, manage battery consumption and detect failure warnings from anywhere in the world. Other features include an energy saving working mode function switch and real time GPS maps to name a few. 

    Leadsun-LOGO-AD logo

    Leadsun – always innovating, always moving forward, and always dependable.

    Leadsun applies the experience and expertise built through distributing more than 300,000 light systems – as well as world-class solar lighting engineering design and technology – to provide local authorities solutions and guidance they can depend on.

    Trusted by over 150 councils Australia wide

    FEATURE PROJECT

    Angliss Reserve Car Park
    Maribyrnong City Council

    12 SMART public lights fully installed & operational in one day! 

    Leadsun was awarded a project involving the installation of a
    fully compliant Off-Grid solar powered lighting system featuring
    12 AE3 series solar lights, EZYfoot concrete-less footings & EZYlift lowerable poles throughout a newly constructed carpark.

    The challenge was that the entire project had to be completed within 2 days and with minimal disruption to car park access. The Leadsun projects team was up to the challenge and successfully installed all 12 Solar Lights from ‘start to finish’ in just one day!

    Before After William Angliss Reserve solar car park lighting during the dayWilliam Angliss Reserve solar car park lights at night

    Energy Savings

    Compared to conventional Grid-Power lighting, the cost of installing and maintaining an Off-Grid solar power solution is significantly more economical and has far less impact on the environment.

    Over a 10 year period, the value proposition for this lighting project compared to Grid-Powered lighting would equate to $35,000 in savings.

    Energy-Wheel logo